Semoga layanan kami dapat mempermudah pekerjaan Anda!
Semoga layanan kami dapat mempermudah pekerjaan Anda!
Place of Origin: | Chongqing city,China Mainland |
Nama merek: | CCEC |
Sertifikasi: | ISO9001:2008 |
Model Number: | KTA19-P755 |
Minimum Order Quantity: | 1 unit |
---|---|
Harga: | Negotiation |
Packaging Details: | Wooden box with plastic bag inside or Custimized as client's request |
Waktu pengiriman: | 10-20 hari setelah pembayaran yr |
Payment Terms: | L/C, T/T, Western Union |
Menyediakan kemampuan: | 300 unit / per bulan |
Mengetik: | Mesin diesel | Mesin Model: | KTA19-P755 |
---|---|---|---|
Merek: | CCEC Cummins | Silinder: | 6 Silinder di Jalur |
Daya siaga: | 563KW | Kecepatan: | 1500 rpm |
Perpindahan: | 19L | Garansi: | 12 bulan |
Kondisi: | baru dari pabrik asli Cummins |
KTA19- P755 CCEC Cummins Mesin Pompa Air Industri
Deskripsi Produk:
Mesin Chongqin Cummins Marine asli | |
Model mesin | KTA19-P755 |
Merek Mesin | CCEC |
Cocok untuk | Laut |
Cara asupan udara | Turbo diisi, mid-cooling |
Nomor silinder | 6 |
Jenis bahan bakar | Diesel |
Posisi silinder mesin | 6 silinder sejalan |
Pemindahan | 19L |
Daya output maksimal | 563kw |
Dinilai kecepatan daya | 1800 RPM |
Kinerja
1 Efisiensi Bahan Bakar Tinggi: Konsumsi bahan bakar yang lebih sedikit pada tingkat terdepan dibandingkan produk pesaing lainnya.
2 Turbocharger dengan desain wastegated: Mengoptimalkan pengoperasian melintasi kurva torsi sehingga menghasilkan torsi low-end yang sangat baik.
3 Mesin yang ringkas namun tahan lama dan dapat diandalkan: Mesin seri B mengandung hingga 40 % bagian lebih sedikit daripada mesin kompetitif di kelasnya. Hal ini menghasilkan rasio daya-ke-berat yang lebih baik, lebih sedikit peluang kegagalan dan biaya perbaikan lebih rendah.
4 Desain dan manufaktur canggih: membuat mesin menghasilkan kinerja yang unggul dan biaya yang lebih rendah daripada mesin yang kompetitif.
CCEC Cummins Industry Engine Model List seperti di bawah ini:
Model mesin | kW / rpm |
NT855-P250 | 187/1800 |
NT855-P270 | 201/1500/1800 |
NT855-P300 | 224/1500/1800 |
NT855-P360 | 269/1800 |
NT855-P400 | 298/1800 |
NTA855-P220 | 164/1500 |
NTA855-P250 | 186/1800 |
NTA855-P320 | 239/1800 |
NTA855-P350 | 261/1800 |
NTA855-P360 | 269/1800/2100 |
NTA855-P380 | 283/1800 |
NTA855-P400 | 298/1500/1800/2100 |
NTA855-P450 | 317/1800 |
NTA855-P450 | 336/1800/2100 |
NTA855-P470 | 351/1500 |
NTA855-P500 | 373/1800 |
QSNT-P300 | 224/1500/1800 |
QSNT-P360 | 269/2100 |
QSNT-P400 | 298/1500/1800/2100 |
QSNT-P450 | 336/1800/2100 |
QSNT-P470 | 351/1500 |
KT19-P450 | 336/2100 |
KTA19-P440 | 328/1500 |
KTA19-P450 | 336/1500/1800 |
KTA19-P475 | 354/1500 |
KTA19-P500 | 373/1500/1800 |
KTA19-P525 | 392/1800/2100 |
KTA19-P540 | 403/1500 |
KTA19-P575 | 429/1800 |
KTA19-P600 | 448/1500/1800/2100 |
KTA19-P680 | 507/1500/1800 |
KTA19-P700 | 522/1800 |
KTA19-P750 | 559/1800 |
KTA19-P755 | 563/1800/1900 |
KTAA19-P673 | 502/1500 |
KTAA19-P735 | 548/1800 |
KTAA19-P764 | 570/1500 |
KTAA19-P783 | 647/1500 |
KTAA19-P818 | 610/1500 |
KT38-P780 | 582/1500/1800 |
KT38-P830 | 619/1500 |
KT38-P900 | 672/2100 |
KTA38-P810 | 605/1500 |
KTA38-P850 | 634/1500 |
KTA38-P880 | 657/1500 |
KTA38-P890 | 664/1500 |
KTA38-P900 | 671/1800 |
KTA38-P940 | 702/1500 |
KTA38-P980 | 731/1500 |
KT38-P1000 | 746/1800 |
KTA38-P1030 | 769/1800 |
KTA38-P1050 | 784/2100 |
KTA38-P1080 | 806/1500 |
KTA38-P1100 | 810/1800 |
KTA38-P1200 | 896/1500/1800 |
KTA38-P1300 | 970/1500 |
KTA38-P1400 | 1045/1800/1900 |
KTA38-P1490 | 1112/1800 |
KTA38-P1500 | 1119/1900/2100 |
KTA50-P1460 | 1089/1900 |
KTA50-P1600 | 1194/1900 |
KTA50-P1645 | 1227/1500 |
KTA50-P1675 | 1250/1800 |
KTA50-P1800 | 1343/1900 |
KTA50-P1915 | 1428/1500 |
KTA50-P2000 | 1492/1900 |
KTA50-P2220 | 1655 // 1800 |
KTTA50-C2000 | 1492/1900 |
Gudang Kami:
Undangan untuk mengunjungi pabrik kami
1. Jika Anda tertarik dengan produk kami, kami dengan tulus mengundang Anda untuk mengunjungi pabrik kami ketika Anda berada di Cina.
2. Pabrik kami terletak di Kota Xiangyang, Provinsi Hubei, Cina, yang terkenal dengan Mobilnya.
Dan Anda bisa terbang dari Wuhan, Beijing, Shanghai langsung.
3. Di pabrik kami dapat mendiskusikan lebih lanjut tentang kerja sama dan kami akan mendengarkan kebutuhan Anda.
Pembayaran:
T / T, deposit 30%, 70% akan dibayar sebelum pengiriman
T / T, deposit 30%, 70% L / C pada pandangan
100% L / C pada pandangan
Rincian Kemasan & Pengiriman
1. Dikemas dalam kasus kayu, 1 unit / kasus kayu.
2. Waktu pengiriman: 15-20 hari setelah menerima pembayaran thn
Engi